Monthly Archives February 2012

Dam Report – Watchic Lake 2013

The dam operated flawlessly for the year. The dam was closed April 14, 2013 at ice out to raise the lake level for the season. Full pond water level was not achieved until June, due to the light spring run-off. During the summer the dam was opened 8 times to the first position for total of 23 days. This maintained the lake level within plus or minus 1 inch of full pond for the summer well within the plus or
Read More